Substation Grounding Design ELCL 9098

Online

Our Substation Grounding Design course focuses on the correct design for a substation grounding system using the ETAP software grounding model and following the standard requirements of the IEEE 80. Learn how to correctly model a grounding system by calculating ground potential rise (GPR), touch voltage and step voltage limits. Get the skills you need to ensure the safety of personnel and equipment by studying different scenarios and grounding interconnection.

Prerequisites

Note(s)

Course Essentials:

The ETAP software used in this course requires a computer with a 2 GHz (or greater) processor, 8 GB (or greater) RAM, and a Microsoft Windows 8 (or higher) 64-bit operating system.

Hours and Fees

Hours

30

Fee

$346.81, includes a non-refundable materials fee of $100

Upcoming Sections

Past Sections

Read about our textbooks policy, and remember that the Continuing Education attendance policy and closure dates differ from those for full-time college programs.